QLD Licence 90899 · Three phase installations since 2016
Need three phase power for your workshop, business or home? SEQ Sparky installs and upgrades three phase power across Brisbane Southside. From Energex applications to switchboard upgrades and final connection. Fully licensed, fully insured, quoted on site by Anthony.
Serving homes across Brisbane Southside, Logan, and Redlands.
You have a workshop, shed or business that needs to run large motors, compressors, welders or commercial machinery. Most heavy industrial and commercial equipment requires three phase power to operate. Single phase simply cannot deliver the power these machines demand without overloading circuits and tripping breakers.
You want to install a large solar system, battery storage or a high powered EV charger that runs at 11kW to 22kW. Three phase power lets you spread the load across three circuits instead of one, giving you more capacity and a more balanced electrical system.
You are installing a large ducted air conditioning system that requires three phase power. Most ducted systems above 14kW need a three phase supply to run the compressor. If your home only has single phase you will need a three phase upgrade before the aircon can be installed.
You are running a shop, cafe, office or multi-tenancy building that needs more power than a single phase supply can deliver. Three phase power gives commercial properties the capacity to run multiple high draw appliances, lighting circuits and HVAC systems simultaneously without overloading.
Three phase power delivers three times the capacity of single phase. It is the standard for commercial properties, workshops and homes with high electrical demand.
Single phase power delivers up to 63 amps on one circuit. Three phase delivers power across three circuits simultaneously, tripling your total available capacity. This means you can run more equipment, more appliances and more circuits without overloading your supply. A new switchboard designed for three phase ensures your board can distribute the extra power safely.
Large motors, compressors, lathes, welders and commercial kitchen equipment are designed to run on three phase power. Running them on single phase through converters or undersized circuits reduces performance, increases running costs and shortens the life of the equipment. Three phase gives your machinery the clean power it was built for.
Three phase power lets you spread your electrical load evenly across three phases instead of putting everything on one. This reduces voltage drop, prevents overloading on any single phase and gives you a more stable, efficient electrical system. Balanced loads also mean fewer tripped breakers and less flickering lights.
Whether you are planning solar, battery storage, an EV charger, ducted aircon or a workshop fit out, three phase power gives you the capacity to add whatever comes next without hitting a wall. Installing three phase now means you are not paying for another upgrade in two years when your needs grow.
Every quote is fixed in writing before work starts. No day-rate blowouts. No hidden materials charges.
Run a three phase circuit from existing three phase board
New three phase switchboard installed
Full installation from meter to machinery
Final price depends on your current supply, Energex requirements, cable run distances and the number of circuits needed. Anthony inspects on site and quotes in writing within 24 hours. Energex fees are quoted separately as they are set by the network provider.
Every Three Phase Power Brisbane homeowners book is completed to current AS/NZS 3000 standards and includes all of the following. No surcharges, no upsells on the day.
We handle the Energex application process for your three phase supply upgrade including the paperwork, technical requirements and coordination with the network provider. You do not need to deal with Energex directly.
Every three phase circuit is tested for phase rotation, voltage balance, insulation resistance, earth continuity and loop impedance. Certificate of Electrical Safety issued on completion.
A new three phase switchboard is supplied and installed with three pole main switch, individual circuit breakers, safety switches on all circuits and surge protection. Designed with room for future expansion.
Anthony does the work personally. Not an apprentice. Not a subbie. Not a call centre dispatch. Three phase installation is specialist electrical work that requires a licensed and experienced electrician.
All three phase cable runs are sized correctly for the load they carry. No undersized cables that overheat under sustained load. Every run is installed in conduit where required and secured neatly.
Labour warranty on the complete installation plus full manufacturer warranty on the switchboard, breakers and all components fitted.
Anthony, Owner and Licensed Electrician · QLD Licence 90899
Planned carefully, coordinated with Energex, completed on schedule.
Anthony inspects your property, checks your current supply, assesses what equipment or systems need three phase power and determines the best route for cable runs. You get a detailed written quote covering the electrical work and an outline of Energex fees.
We submit the application to Energex for your three phase supply upgrade and coordinate the meter changeover. Anthony manages the process so you have one point of contact throughout.
New switchboard installed, three phase circuits wired to your equipment or connection points, all cable runs completed with correct sizing and protection. Anthony does the work himself and keeps the site organised throughout.
Every circuit is tested for correct phase rotation, voltage balance and safety switch operation. Certificate of Electrical Safety issued. Anthony walks you through the new switchboard and confirms everything is running as it should.
Real switchboards, real equipment, real results. Every job photographed on site.

Three phase control panel with contactors and relay boards powering industrial equipment

Inovance variable speed drives with EMI filters providing precision three phase motor control

Three phase Clipsal switchboard with colour coded phase wiring and circuit breakers

Old three phase terminal connections with worn insulation replaced during an upgrade
We service Queenslanders, brick and tile, townhouses and newer builds. Every housing era Brisbane has.
Straight answers on cost, Energex requirements, equipment and what is actually involved.
A dedicated three phase circuit from an existing three phase board starts from $800 ex GST. A full switchboard upgrade from single phase to three phase starts from $5,500. A complete three phase fit out for workshops and commercial properties starts from $8,000. Energex fees for the supply upgrade are additional and quoted separately. Anthony provides a fixed price written quote on site.
Single phase power delivers electricity on one active conductor at 230V. Three phase delivers electricity on three active conductors at 400V. Three phase provides roughly three times the power capacity of single phase and is required for large motors, commercial equipment, ducted air conditioning and high powered EV chargers.
No. Anthony handles the Energex application, coordinates the meter changeover and manages the process from start to finish. You have one point of contact throughout the entire job.
The electrical work typically takes 1 to 2 days. However the total timeline depends on Energex processing and scheduling the meter changeover which can take 2 to 6 weeks. Anthony submits the application as early as possible to minimise the wait.
In most Brisbane suburbs yes. Three phase power is available from the Energex network in most areas. Anthony checks availability at your address during the site inspection. In some cases the three phase supply may already be at your meter and only needs to be connected and distributed through a new switchboard.
Yes. A single phase switchboard cannot distribute three phase power. A new three phase switchboard with a three pole main switch, individual circuit breakers and safety switches is required. The new board is sized with room for future expansion.
Three phase power itself does not reduce your per-kWh rate. However three phase motors and equipment run more efficiently than single phase equivalents. A balanced three phase system also reduces voltage drop and line losses which can improve overall efficiency, especially for workshops and commercial properties.
Common three phase equipment includes large ducted air conditioners, commercial kitchen appliances, welders, large compressors, lathes, CNC machines, high powered EV chargers above 7kW, large solar inverters and commercial HVAC systems. If the nameplate on your equipment says 400V or three phase it needs a three phase supply.
Yes. We run three phase circuits from your switchboard to sheds, garages and detached workshops. The cable is run in underground conduit or overhead depending on the distance and site layout. Anthony assesses the best route during the site inspection.
Yes. Three phase switchboards should have three phase surge protection installed to protect all three phases from lightning strikes and grid spikes. Brisbane’s storm season makes surge protection essential for any three phase installation. We include surge protection as standard on all new three phase switchboards.
Fixed price quote within 24 hours. Energex application managed for you. Call Anthony directly, no call centre, no middleman, no runaround.